TOGETHER, LET'S DEFINE YOUR NEED FOR YOUR LOADING SOLUTIONS

fOR YOUR LOADING ARMS AND UNLOADING ARMS PROJECTS:
  • New project, on-site replacement, optimisation of an existing arm, modification of the installation

  • Type of tanker (fluid, gas, bulk, single-compartment, multi-compartment, ISO container, etc.)

  • Connection mode: top or bottom

  • Type of tanker: road or rail

  • Fixed or variable-reach design

  • Diameter (DN)

  • Fluid characteristics: type of fluids, temperature, pressure, viscosity, MSDS

  • Required options

  • Site requirements and constraints

  • Installation of an additional gangway or not (complete loading system project)

FOR YOUR TANKER ACCESS GANGWAY AND LOADING SYSTEM PROJECTS:
  • New project, on-site replacement, optimisation of an existing piece of equipment, modification of an existing installation

  • Type of tanker (fluid, gas, single-compartment, multi-compartment, ISO container, etc.)

  • Height and length of the tanker concerned

  • Nature of the work to be carried out on the top of the tanker

  • Frequency of use (number of lorries per hour, day, week or month)

  • Dimensions of the existing building in (x, y and z), dimensions of the existing platform

  • Space available at ground level for a new project

  • Additional loading arm installation or not (complete loading system project)

Loading platform and custom safety cage, safe access to tanker top, Pacquet